Town of Bradley's

Proposed Road Projects for 2010-2011

Bradley Home Page


Year of 2010:

   Deer Lake Rd. & Deer Lake Rd. East – Recondition, Pulverize, Add Base, and Resurface

   High View Rd. – Pulverize, Add Base, and Resurface

   Alber Rd. – From CTH O to 1950’ – Resurface

   Alery Rd. – Widen, Ditch, and Remove Corduroy

   Stelling Rd. – From CTH E to .2 Tenths of a Mile – Clean Ditches

   Norten Rd. – Clean Shoulders

   Beaver Lake Rd. – Re-Gravel

   Kyes Rd.  – End of Kyes Rd. Blacktop to Town of Skanawan Line – Re-Gravel


Year of 2011:

   Alery Rd. – From CTH E to .2 Tenths of a Mile Past Blum Rd. – Pulverize, Add base, and Resurface

   Alery Rd. – .2 Tenths of a Mile Past Blum Rd. to End – Re-Gravel

   Blum Rd. – Allery Rd. to Rock Falls Line – Pulverize and Gravel

   Stelling Rd. – Pulverize, Add Base, and Resurface

   Wadell Rd. – From CTH E to 3/4th of a Mile – Add Base and Surface

   Peaceful Valley Rd. – From Coda Ln. to End – Clear and Grub

   Re-Gravel – Either Swamp Rd. or Red Pine Rd.


This 2 year plan is subject to change depending on finances and unforeseen problems.

 

Possibly 3rd Year Options:

 

   Gravel Crushing – Re-Supply Storage Pile

   Norton Rd. – Pulverize, Add Base, and Resurface

   Road Lake Rd. – Pulverize, Add Base, and Resurface

   Curve Inn Rd. – Pulverize, Add Base, and Resurface

   Peaceful Valley Rd. – Coda Ln. to End – Pulverize, Add Base, and Resurface

   Milky Rd. – Clean Shoulders and Grub

   Moodig Rd. – From Muskellunge Lake Rd. South over Swamp – Pulverize, Add Base, and Resurface

   Kablitz Rd. – Pulverize, Add Base, and Resurface

   Greenwood Rd. – Pulverize, Add Base, and Resurface

   Tamarack Ln. – Replace Culverts